Customization: | Available |
---|---|
Material: | Container |
Color: | Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1 | wall panel | wall panel | 75mm tickness EPS / rockwool/PU sandwich panel |
insulation wall panel | 50mm tickness EPS / rockwool/PU sandwich panel | ||
2 | roof panel | interior top board | 75mm tickness EPS / rockwool PU sandwich panel |
3 | insulation top part | 50mm fibreglass +60mm foam | |
4 | exterior top board | 0.5mm thick color coated steel | |
STEEL FRAME | |||
5 | steel frame | column | 2.5mm steel bending |
6 | foundation main beam | 3.0mm steel bending | |
7 | foundation secondary beam | 2.5mm steel bending | |
8 | top framework | 3.0mm steel bending | |
9 | channel for forklift | 3.0mm steel bending | |
10 | reinforced steel board | 6mm thickness steel borad | |
11 | channel for wall panel | 0.8mm stainless steel bending | |
12 | corner fitting | special for container house,ISO standard | |
13 | corner line for decorate wall edged | 25 anlge aluminum | |
FLOOR | |||
14 | floor | multi-plywood | 2440*1220*18mm |
15 | plastic floorboard | 1.5mm thickness, water proof | |
DOOR&WINDOW | |||
16 | DOOR&WINDOW | door | EPS door with aluminum alloy canopy or steel door |
17 | window | UPVC/ aluminum sliding window | |
18 | window wrap page | aluminum |
Electronic installations
20ft | 40ft | |
Fluorescent lighting(36W) | 2pcs | 4pcs |
switch | 1pcs | 2pcs |
400V/5-pole3*32CEE plug-in |
1pcs (outside in the frame ) |
2pcs (outside in the frame) |
230Vplug-in | 3pcs | 6pcs |
fuse-board with FI relay & miniiature circuit breakers |
1pcs | 2pcs |
distribution box | 1pcs | 1pcs |
1. Construction management
We act as advocates for our clients, performing due diligence in the pre-construction phase, minimizing risks for our clients and starting projects off.
From project accounting to overseeing the team, from maintaining schedules to bidding to outside vendors, we offer our industry knowledge.
When overseeing the bidding process and executing the project it is our role to drive value, both in terms of our initial bid and by controlling the project.
Design and build is all about working with efficiencies created within the design phase, thereby minimizing on-site labor and executing seamlessly while controlling costs.
Accessories
Our Projects
FAQ
♥Q: Are you a factory or trading company?
A:Guangzhou Moneybox Steel Structure Engineering Co., Ltd. is a factory located in Panyu district, Guangzhou, Guangdong province.
♥Q: What's your supply capacity?
A:Annual Production: container house 72000sets,prefab house 564000square meters;portable toilet 24000sets;steel structure 360000square meters .
♥ Q:How to install ?
A:We will provide installation instruction and video for you, technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation,wages will be provided by buyers.
♥ Q: How long is your delivery time?
A:Generally it is within 2-30 days ,definitely according to quantity and color.
♥Q: How do you guarantee the quality of the products?
A:Strict product quality control, quality makes the future.This is the tenet of our factory. Each product from our factory has strict testing procedures, and must be 100% quality before delivery.
♥Q: How can I get the quotation of the project ?
A:If you have drawing ,we can offer you our quotation according to your drawing .
If you have no design , Our engineer will design some drawings for you to confirm. And then offer you a quotation.
Company Information